CONNECT WITH US

GSMC president says two 8-inch fabs to begin volume production in March 2003

Michelle Cheng, Silicon Valley; Willie Teng, DIGITIMES Asia 0

Grace Semiconductor Manufacturing Corporation’s (GSMC) two 8-inch fabs, currently under construction in Shanghai, will enter volume production in March 2003, Nasa Tsai, company president and COO, said when being asked about the fabs’ construction...

The article requires paid subscription. Subscribe Now