CONNECT WITH US

ProMOS: 12-inch fab nearing volume production

Max Wang, Taipei; Noah Sauve, DIGITIMES Asia 0

Albert Lin, COO and spokesperson of ProMOS Technologies, said set-up at the company’s new 12-inch wafer fab is right on schedule. All needed equipment should be installed in June and July, followed by pilot production on August 23. The finished...

The article requires paid subscription. Subscribe Now